• Economy
  • Investing
  • Editor’s Pick
  • Stock
Keep Over Tradings
Investing

CHARBONE Confirms Construction Schedule on Track at Sorel-Tracy and Announces the Imminent Start of Equipment Installation Phase

by November 12, 2025
by November 12, 2025

(TheNewswire)

Brossard, Quebec TheNewswire – November 12, 2025 CHARBONE CORPORATION (TSXV: CH,OTC:CHHYF; OTCQB: CHHYF; FSE: K47) (‘ CHARBONE ‘ or the ‘ Company ‘), a North American producer and distributor specializing in clean Ultra High Purity (‘ UHP ‘) hydrogen and strategic industrial gases, is pleased to confirm that the construction schedule at its Sorel-Tracy site remains fully on track with the equipment installation phase set to begin in the coming days.

The civil construction works , which began on October 27, 2025 , are now completed , including foundation preparation and all required technical infrastructure for the reassembly of the main production systems. All major components delivered in October will be installed on-site before the end of the month, keeping the project on pace for the planned commissioning in November 2025 of Phase 1a.

‘ The fact that our schedule remains perfectly on track reflects the efficiency and dedication of our teams, along with the exceptional collaboration of our technical and municipal partners ,’ said Dave B. Gagnon, CEO of CHARBONE . ‘ We are now entering the most tangible phase of the project — the installation of the equipment — marking the transition toward testing and commissioning of our first clean UHP hydrogen production module in Quebec .’

The Sorel-Tracy site represents CHARBONE’s first local and modular clean hydrogen production facility in Quebec, aligning with the Company’s broader vision to develop a decentralized North American network for the production and distribution of clean and strategic industrial gases. For more information on the Company’s 5 phased approach and economics for CHARBONE’s modular facility, please see the latest investor presentation on the Company’s website.

About CHARBONE CORPORATION

CHARBONE is an integrated company specializing in clean Ultra High Purity (UHP) hydrogen and the strategic distribution of industrial gases in North America and Asia-Pacific. Through a modular approach, the Company is building a distributed network of green hydrogen production plants while diversifying revenues via helium and specialty gas partnerships. This disciplined model reduces risk, enhances flexibility, and positions CHARBONE as a leader in the transition to a low-carbon future. CHARBONE is listed on the TSX Venture Exchange (TSXV: CH,OTC:CHHYF) , the OTC Markets (OTCQB: CHHYF) , and the Frankfurt Stock Exchange (FSE: K47) . Visit www.charbone.com .

Forward-Looking Statements

This news release contains statements that are ‘forward-looking information’ as defined under Canadian securities laws (‘forward-looking statements’). These forward-looking statements are often identified by words such as ‘intends’, ‘anticipates’, ‘expects’, ‘believes’, ‘plans’, ‘likely’, or similar words. The forward-looking statements reflect management’s expectations, estimates, or projections concerning future results or events, based on the opinions, assumptions and estimates considered reasonable by management at the date the statements are made. Although Charbone believes that the expectations reflected in the forward-looking statements are reasonable, forward-looking statements involve risks and uncertainties, and undue reliance should not be placed on forward-looking statements, as unknown or unpredictable factors could cause actual results to be materially different from those reflected in the forward-looking statements. The forward-looking statements may be affected by risks and uncertainties in the business of Charbone. These risks, uncertainties and assumptions include, but are not limited to, those described under ‘Risk Factors’ in the Corporation’s Filing Statement dated March 31, 2022, which is available on SEDAR at www.sedar.com; they could cause actual events or results to differ materially from those projected in any forward-looking statements.

Except as required under applicable securities legislation, Charbone undertakes no obligation to publicly update or revise forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release .

Contact Charbone Corporation

Telephone: +1 450 678 7171

Email: ir@charbone.com

Benoit Veilleux

CFO and Corporate Secretary

Copyright (c) 2025 TheNewswire – All rights reserved.

News Provided by TheNewsWire via QuoteMedia

This post appeared first on investingnews.com
0 comment
0
FacebookTwitterPinterestEmail

previous post
Terra Clean Closes the Acquisition of the Past Producing Uranium Claims in San Rafael Swell, Utah, United States
next post
CHARBONE confirme le respect de l’echeancier de construction a Sorel-Tracy et annonce le debut imminent de la phase d’installation des equipements

Related Posts

Pinnacle Identifies Gold-Silver Mineralization at Historic La Dura...

November 12, 2025

Angkor Resources Engages Departure Capital Inc. for Marketing...

November 12, 2025

USA Rare Earth Secures UK Approval to Acquire...

November 12, 2025

Silver Dollar Discovers New Mineralized Zone at the...

November 12, 2025

Crypto Market Update: Coinbase to Move to Texas,...

November 12, 2025

Stallion Uranium Closes Technology Data Acquisition Transaction &...

November 12, 2025

CHARBONE confirme le respect de l’echeancier de construction...

November 12, 2025

1911 Gold Announces C$20 Million “Best Efforts” Life...

November 12, 2025

Terra Clean Closes the Acquisition of the Past...

November 12, 2025

Questcorp and Riverside Complete the First Phase of...

November 12, 2025

Recent Posts

  • Pinnacle Identifies Gold-Silver Mineralization at Historic La Dura Mine, Extending Mineralized Horizon to Almost 500 Metres
  • Angkor Resources Engages Departure Capital Inc. for Marketing and Investor Relations Services
  • USA Rare Earth Secures UK Approval to Acquire Less Common Metals
  • Silver Dollar Discovers New Mineralized Zone at the Nora Silver-Gold Project and Receives Drill Permit
  • Stallion Uranium Closes Technology Data Acquisition Transaction & Engages Marketing Services

    Master Your Money – Sign Up for Our Financial Education Newsletter!


    Ready to take your financial knowledge to the next level? Our newsletter delivers easy-to-understand guides, expert advice, and actionable tips straight to your inbox. Whether you're saving for a dream vacation or planning for retirement, we’ve got you covered. Sign up today and start your journey to financial freedom!

    Recent Posts

    • Pinnacle Identifies Gold-Silver Mineralization at Historic La Dura Mine, Extending Mineralized Horizon to Almost 500 Metres

      November 12, 2025
    • Angkor Resources Engages Departure Capital Inc. for Marketing and Investor Relations Services

      November 12, 2025
    • USA Rare Earth Secures UK Approval to Acquire Less Common Metals

      November 12, 2025
    • Silver Dollar Discovers New Mineralized Zone at the Nora Silver-Gold Project and Receives Drill Permit

      November 12, 2025
    • Stallion Uranium Closes Technology Data Acquisition Transaction & Engages Marketing Services

      November 12, 2025
    • Crypto Market Update: Coinbase to Move to Texas, JPMorgan Deploys Dollar Deposit Token

      November 12, 2025

    Editors’ Picks

    • 1

      Surface Metals Inc. Grants Options and Provides Update on Financial Marketing

      November 8, 2025
    • 2

      Questcorp Mining Provides Clarification on Private Placement Investment

      November 10, 2025
    • 3

      Locksley Resources LimitedLiDAR Survey at Antimony Mine Advances U.S. Production Plans

      November 10, 2025
    • 4

      Mark Skousen: Gold, Silver in Major Bull Market, “Permanent Inflation” is Here

      November 11, 2025
    • 5

      Torchlight Innovations Inc. Announces Name Change to RZOLV Technologies Inc

      November 10, 2025
    • 6

      Optimisation Update

      November 10, 2025
    • 7

      Steve Penny: Silver, Gold, Uranium — Price Targets and My Strategy

      November 10, 2025

    Categories

    • Economy (5)
    • Editor’s Pick (4)
    • Investing (62)
    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting

    Disclaimer: keepovertrading.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2025 keepovertrading.com | All Rights Reserved

    Keep Over Tradings
    • Economy
    • Investing
    • Editor’s Pick
    • Stock
    Keep Over Tradings
    • Economy
    • Investing
    • Editor’s Pick
    • Stock
    Disclaimer: keepovertrading.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2025 keepovertrading.com | All Rights Reserved

    Read alsox

    Osisko Intersects 330.6 Metres Averaging 0.46% Cu...

    November 12, 2025

    ReeXploration: Building the Next Generation of Responsible...

    November 12, 2025

    Questcorp Mining Receives Initial Investment from U.K....

    November 11, 2025